Initial Installation Checklist
Chapter 1. Installation Worksheets 1-3
__ 1. Partition Updates
__ 2. Modify Standard Labels
__ 3. Add a Dummy Tape Device and Modify Tape Modes
__ 4. Update SVA Size
__ 5.
Increase System GETVIS
__ 6.
Increase Partition GETVIS
__ 7. Increase Dynamic Space GETVIS
__ 8. Update LIBDEF Procedures
__ 9.
Multi-Partition and Multi-CPU Environments
__ 10. Modify BIM-EPIC Configuration Options
__ 11.
Activate BIM-EPIC
__ 12. Finish CICS Installation
__ 1. Activate BIM-EPIC Support for Multiple Job Exits
__ 2.
Create JCL for Maintenance and System Recovery
__ 3. Convert From Your Current Tape/Disk Manager
__ 4.
Implement BIM-EPIC
__ 5.
Sort Interface Macro (TSSRTDEF)
__ 6.
Code Label Print Program (optional)
__ 7.
Install Autoattach Feature (optional)
__ 8. Configure Vaults and Vaulting Methods (optional)
Updating the ASI
Procedure
Final Base
Installation
Procedures