Memorex LOCK - VERSION 2-24 Technické informace Strana 62

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 568
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 61
Using Disk Processing
1-44 User Reference
Connectivity Systems, Inc.—Copyright © 2006
Use Pursuant to Company Instructions
BIM-EPIC Disk Processing
Using Disk Processing
Description The tasks performed for disk open, close, and end-of-extent processing
are similar to the tasks performed for tape processing. For disk
processing, BIM-EPIC must make the space allocation, which is more
complicated than finding the correct tape volume.
Quick Disk
Allocation
(QDAS)
During every open process, VSE reads the VTOC sequentially, which can
require thousands of I/O operations. BIM-EPIC provides the Quick Disk
Allocation System (QDAS) which dramatically decreases the time
required to allocate an output dataset.
QDAS maps disk volume free space to virtual storage. One map is created
for each QDAS-controlled volume when the BIM-EPIC is initialized.
When disk space is used or freed for any controlled dataset or
uncontrolled dataset, QDAS updates the map in storage.
Note:Note:
QDAS updates the maps only when the VTOCs of the disk volumes under
its control are updated using the VSE common VTOC handler
($IJJHCVH). Programs that update the VTOC directly may bypass the
QDAS interface and cause the maps to get out of sync with the VTOC.
This applies to a very limited number of programs, such as DITTO.
However, should this condition occur, you can refresh the QDAS map
tables at any time. See Chapter 4 of the BIM-EPIC Installation and
System Guide for additional information.
Because QDAS maps free space, you must refresh the map tables daily to
reallocate the space made available by expired Start Track 1 files. This
refresh is not necessary if the disk files are catalog controlled. It is
recommended that this procedure be performed as part of the BIM-EPIC
daily maintenance procedures which should occur after midnight. See the
BIM-EPIC Installation and System Guide for additional information.
The following events occur on output.
BIM-EPIC locates the pool where the dataset is assigned. For
cataloged datasets, BIM-EPIC locates the pool in the DSN
Catalog entry. For Start Track 1 datasets, BIM-EPIC locates the
pool in the JCL EXTENT statement.
If the dataset is non-generation, BIM-EPIC deletes the old
version from the VTOC. For cataloged datasets, a new version is
Zobrazit stránku 61
1 2 ... 57 58 59 60 61 62 63 64 65 66 67 ... 567 568

Komentáře k této Příručce

Žádné komentáře